> For the complete documentation index, see [llms.txt](https://docs.vega365.com/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://docs.vega365.com/xport/user-manual/upgrade-everything-workflow/migration-time-estimate.md).

# Migration Time Estimate

<table><thead><tr><th width="152.33331298828125">Feature</th><th>How long does it take?</th></tr></thead><tbody><tr><td>Devices</td><td>Tens of seconds per device.</td></tr><tr><td>Roles</td><td>A few minutes at most.</td></tr><tr><td>View groups</td><td>A few minutes at most.</td></tr><tr><td>Media Database</td><td><strong>Media Database Copy</strong><br>This depends on the size of the database, the network speed, the disk read speed at the source, and the disk write speed at the target. See: <a href="https://vega25.com/xport/xport-media-migration-estimator/">https://vega25.com/xport/xport-media-migration-estimator/</a> <br><br><strong>Media Reconfiguration &#x26; Database Rebuild</strong><br>The Milestone Recorder rebuilds its database after media reconfiguration, with the duration depending on the size of the database. We've observed that the two steps for 41TB of data take four hours.</td></tr><tr><td></td><td></td></tr></tbody></table>
